![avs synchrotron](/media/images/area/3f/e3/3fe32edd27fc8ca5d2f295e84e5d5363bb40d8ff.png)
HIGH HEAT LOAD PRIMARY APERTURE High heat load primary aperture
2014 | CHESS
![High heat load primary aperture](/media/images/subproject/aa/77/aa77a736050b1d3c576526abd0fe4024ef53a1ff.png)
This high heat load primary aperture is part of the front end of an undulator beamline. It is installed between two shutters and combines an aperture and a horizontal collimator. Both are water-cooled and were design for 250 mA operation at a 5.3 GeV machine, with a peak heat load of 155 W/mm2 totaling 2 kW.
Working pressure: UHV
Client: CHESS